Financed by the Modernisation Fund

Construction of a photovoltaic power plant, utility connections and construction site organisation

FUTURE GREEN INVEST SRL signed financing agreement no. 1271/22.10.2025 (SMIS 332972) for implementation of the project under Key Programme 1: Renewable energy sources and energy storage, call PFM/322/PFM_P1/NA.

Șomcuta Mare, Maramureș
Project documents

01 / Project objective

Project objective

Developing the company by increasing electricity production from renewable sources through new solar generation capacity. The project contributes to the objectives of Romania’s Integrated National Energy and Climate Plan and the Modernisation Fund.

The investment covers the photovoltaic power plant, fencing and electrical installations needed to connect it to the electricity transmission and distribution network.

Investment components

Photovoltaic power plant

Planned solar electricity generation capacity: 3.6 MW.

Șomcuta Mare, Maramureș

Fencing and site organisation

Works associated with delivering the investment.

Șomcuta Mare, Maramureș

Utility connections and grid connection

Electrical installations for connection to the electricity network.

Șomcuta Mare, Maramureș

Specific objectives and deadline

New capacity
Commissioning a 3.6 MW photovoltaic plant, measured at inverter output, by 31 December 2026.
State aid
Obtaining EUR 149,000 of aid per installed MW by 31 December 2026.
Operating-period production
Target of 88,758 MWh of renewable electricity during the operating period.

02 / Investment structure

Investment structure

Total project value4,532,866.04RON
Maximum financing from the Modernisation Fund2,664,996.12RON
Beneficiary contribution1,867,869.92RON

Maximum financing from the Modernisation Fund represents 77.32% of eligible expenditure and approximately 58.79% of the total project value.

03 / Clear objectives. Measurable results.

Clear objectives. Measurable results.

The indicators below are project targets, not results already achieved.

01New installed capacity3.600 MWFMS04
02Average annual production4,931.000 MWh / yearFMS06
03Estimated annual emissions reduction3,017.280 t CO₂ / yearFMS05
04Capacity factor15.640 %FMS09
05Total production during the reference period88,758.000 MWhFMS07

04 / Project activities

Project activities

01

Preparation and procurement

Preparation of tender documents and delivery of procurement procedures.

02

Design and technical support

Design, technical assistance, site supervision and financial audit services.

03

Execution and monitoring

Execution and monitoring of goods procurement contracts and the financial audit.

04

Project management

Coordination of implementation and project management.

05

Information and publicity

Delivery of the mandatory information and publicity measures required by the financing agreement.

About the Modernisation Fund

Questions about the project?

For comments or questions about project implementation, contact us by phone or use the contact form.

LET’S KEEP IN TOUCH

Have questions?
Contact us.

Contact us